Loading your building brief…
Loading your building brief…
Your building brief
Yonge-Bay CorridorNeighbourhoods (158 model)neighbourhoods-4326.geojsonrow 5 · Ward 10 Spadina-Fort YorkCity Wardscity-wards-data-4326.geojsonrow 25
From City of Toronto open data, Toronto Police and CMHC. Pick a tab below; hover a source tag to see the dataset row behind a figure.
Explore the address and its surroundings.
The records' standout deviations for this address, worst first.
Picking what to flag.
Flagging what stands out in the records…
The basics about the building at this address.
100 Queen St W
No RentSafeTO evaluation with this exact address. RentSafeTO only covers apartment buildings with 3+ storeys and 10+ units.
Unverified
Ontario's November 15, 2018 first-occupancy rule matters: new buildings and additions first occupied for residential use after that date can be exempt from the rent-increase guideline. Year built alone cannot establish rent-control status.
First-occupancy evidence is not in the City datasets used here. Confirm the occupancy history with the landlord before relying on rent-increase limits.
Ontario's rent-increase guidance (opens new tab)Address: Address Points (Municipal) · address-points-4326.csv · row 512,236
City evaluation of common areas, exterior and maintenance records.
No RentSafeTO evaluation is on record for this exact address. RentSafeTO only covers apartment buildings with 3+ storeys and 10+ units, and missing data does not establish a building's condition. Evaluated buildings nearby are listed further down.
Based on what the records flag. Take them to the viewing and tick them off as you ask.
Writing your questions…
CMHC's October survey of purpose-built rental apartments, in CAD per month.
Former City of Toronto (Zones 1-4)CMHC Rental Market Surveyrmr-toronto-2025-en.xlsxrow 12
CMHC Rental Market Survey, October 2025
| Unit type | Vacant unitsclosest to a new lease | All unitsincl. long-time tenants |
|---|---|---|
| Bachelor | $1,713 | $1,526 |
| 1 bedroom | $2,092 | $1,914 |
| 2 bedrooms | $2,857 | $2,457 |
| 3+ bedrooms | Not published | $3,195 |
Paste the rental ad on the home page and the asking rent is compared with these figures here.
Survey averages describe purpose-built rental apartments across Former City of Toronto (Zones 1-4), a much bigger area than one block; condos and basement units rent differently. They are not a valuation of this apartment, and included utilities may differ.
Source: CMHC Rental Market Survey · rmr-toronto-2025-en.xlsx · row 12
RentSafeTO apartment buildings within 500 m, nearest first. Useful for comparing options on the same block.
At or above the city median (92)Up to 10 points belowMore than 10 below
| Address | Score | Distance |
|---|---|---|
| 111 Chestnut StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 6,277 | 90 slightly below median | 204 m |
| 570 Bay StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 5,562 | 97 at or above median | 223 m |
| 110 Edward StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 5,647 | 88 slightly below median | 350 m |
| 150 Elizabeth StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 6,447 | 86 slightly below median | 376 m |
| 252 Victoria StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 797 | 96 at or above median | 414 m |
| 248 Simcoe StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 756 | 95 at or above median | 428 m |
| 25 Elm StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 6,658 | 98 at or above median | 444 m |
| 127 St Patrick StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 1,412 | 96 at or above median | 471 m |
Scores are each building's latest evaluation. What the score means.
Active building permits within 500 m, and the major projects among them.
3,014Building Permitsbuilding-permits-active-permits.csv5 rows, e.g. 64,795, 41,386, 36,397, 30,992, 26,089
active permits
New Building or Demolition permits, or estimated construction cost of $1,000,000 or more.
Building permit · New Building
448 m away
To construct new Ontario Line transit - Osgoode Transit Station
Source: Building Permits · building-permits-active-permits.csv · row 176,516
Building permit · New Building
349 m away
To construct new Ontario Line transit - Queen/Yonge Transit Station
Source: Building Permits · building-permits-active-permits.csv · row 143,354
Building permit · New Building
405 m away
REV 06 - permit revision application to capture the conditions listed in Turnstile Alt Solution 21 215108 ALT 00.REV 05-Sprinkler protection under scaffolding on level 2.
An issued permit does not establish an active construction schedule. Dates and statuses are shown as the City records them.
Planning applications within 500 m: rezonings, site plans, condominiums and subdivisions. One project often has several applications.
Site Plan Control
497 m away
This application is to facilitate a Site Plan Agreement for the subject site, which would permit an extension of the temporary use permit for the outdoor market.
Source: Development Applications · development-applications.csv · row 21,943
Official Plan / Zoning By-law Amendment
355 m away
Proposed development for the Canada Life Campus include: Retention of the existing office buildings with minor alterations at 330 University Avenue, 180 Simcoe Street, and 180 Queen Street West. Demolition of the office building and parking structure at 190 and 206 Simcoe Street. Construction of a 71-storey residential tower on the private open space to the north of the Canada Life Building (Tower A); Construction of two residential towers of 54 storeys (Tower B) and 25 storeys (Tower C) integrated with a multi-use podium element (West Block); Construction of a six-storey Amenity Pavilion to the east of 180 Simcoe Street. Overall, the proposed development includes 64,103 square metres of retained office space, 10,476 of new commercial space, and 114,383 square metres of residential space for 1,402 dwelling units.
All active permits; cleared permits only if completed since 2025-01-01.
Temporary Structures
Active
Temporary Structures · Not Started
Temporary installation of a 20 ft x 20 ft, 12 ft high promotional/wellness station for the 2026 TCS Toronto Waterfront Marathon. Install date October 16, 2026. Removal date October 18, 2026.
Source: Building Permits · building-permits-active-permits.csv · row 150,114
Temporary Structures
Active
Temporary Structures · Under Review
Proposal to erect three temporary structures for Toronto Waterfront Marathon.Set up: 16 Oct. 2026; Tear down: 18 Oct. 2026
Source: Building Permits · building-permits-active-permits.csv · row 69,024
Temporary Structures
Active
Certified Tents · Inspection
Proposed installation of temporary tenting for annual event - ONE- 25mx35m - TENT CERT#25 135831-Anchored by concrete weights., SEVEN- 10'x10' - TENT CERT#25 135788 ,ONE - 10'x20 -TENT CERT#25 135788, TWO - 15'x30' tents, Anchored by clips. Install is Oct13th-14th. Event is Oct 15th . Removal is Oct 16th.
Source:
Requests to the City, Jan 1, 2026 – Sep 30, 2026.
These 311 requests are NOT complaints against the selected building. The City records them by postal area, intersection or ward, never by building.
600
Only requests reported at a street intersection have a location; requests reported by postal code are not included here.
19,118
Every request in the ward, any location type.
Resolution information is unavailable: this dataset has no closed dates or resolution-time fields. “Open” means the status was New or In Progress when the City published the file. Nearby and ward totals cover different areas and should not be compared directly.
Incidents per 100,000 people. Bar: Yonge-Bay Corridor; tick: all of Toronto.
More than 10% below the city rateWithin 10%More than 10% above
Above city rate560 incidents · rate down 55.7 from 2024
Below city rate27 incidents · rate down 72.3 from 2024
Above city rate137 incidents · rate down 361.9 from 2024
Above city rate92 incidents · rate down 33.7 from 2024
Above city rate2 incidents · rate up 5.8 from 2024
Above city rate50 incidents · rate down 100.8 from 2024
Above city rate2 incidents · rate up 5.8 from 2024
Above city rate67 incidents · rate down 72.8 from 2024
Above city rate35 incidents · rate down 85.9 from 2024
Rates are incidents per 100,000 people, published by Toronto Police Service per neighbourhood. Neighbourhood rates describe the whole neighbourhood, not a street or building.
2021 Census · population 12,645Neighbourhood Profiles, 2021 Censusnbhd_2021_census_profile_full_158model.xlsxspreadsheet row 4, neighbourhood 170. Bar: Yonge-Bay Corridor; tick: median of Toronto's 158 neighbourhoods.
More than 10% below the medianWithin 10%More than 10% above
Well above the median
Well above the median
Well below the median
2021 Census, City of Toronto Neighbourhood Profiles (158 neighbourhoods). Shares are computed here from the published counts. Only cost, housing burden and repairs are colour-rated; grey bars are shown for context. Shelter cost is rent plus utilities as the census defines it, from 2021; it is not a current asking rent.
Unverified community feedback and resident experiences.
No reviews yet. Tenant reviews will appear here once posting is available.
Reviews are subjective opinions of contributors and do not represent verified City inspections or formal tenancy dispute determinations.
Source: Building Permits · building-permits-active-permits.csv · row 146,162
Building permit · New Building
307 m away
Proposal for the construction of a 44-storey mixed-use rental apartment building with 1 level below grade, comprising 547 residential units, including 140 affordable units, and a total of 2,402 sqm of non-residential gross floor area.
Source: Building Permits · building-permits-active-permits.csv · row 31,813
Building permit · New Building
294 m away
Proposal for construction of 16-storey mixed-use rental apartment building with 2 levels below grade.
Source: Building Permits · building-permits-active-permits.csv · row 140,394
Building permit · New Building
370 m away
Proposal to construct a new 60 storey mixed use building (plus a mechanical penthouse and an elevator mechanical room), comprising of 694 dwelling units to the rear of the heritage building. A proposed podium is 9-storey's containing the lobby to be located within the heritage building, above grade parking (floors 3 to 8), amenity uses (floors 9 and 10) and retail uses at grade and level 2 in the area currently used as private open space adjacent the heritage building on the north side. There are 131 above grade parking spaces proposed. One below grade level is proposed to include mechanical and service areas and bicycle parking. The application proposes to retain the front portion of the existing heritage building (Bank Building) on the premises.
Source: Building Permits · building-permits-active-permits.csv · row 59,834
Building permit · New Building
379 m away
Proposal for a mixed use development. Current 10 storey office building to be redeveloped into mixed-use 9 storey non-residential podium, 4 storey residential podium on commercial office and 39 storey residential podium for a total of 52 storey development complete with 4 storey of below grade parking basement. Existing heritage facades of 481 University and 210 Dundas St. W to be retained in redevelopment. (20 172223 & 20 172230)
Source: Building Permits · building-permits-active-permits.csv · row 189,130
Building permit · Building Additions/Alterations
158 m away
Proposed interior alteration, modifications to architectural, mechanical, electrical, and structural at levels B4, B2, B1, Ground, Levels 2, 4, 5 and 6 at the North Tower. Also includes floors 7 and 8 under Part B of the scope.
Source: Building Permits · building-permits-active-permits.csv · row 62,797
Building permit · Building Additions/Alterations
336 m away
Proposal for interior alterations to existing office building levels 4, 5, 6, and 7
Source: Building Permits · building-permits-active-permits.csv · row 159,766
Building permit · Multiple Use Permit
412 m away
Amend pemit applications 404282 and 404284 in connection with a new theatre, hotel and dwelling unit building being constructed on the site.
Source: Building Permits · building-permits-active-permits.csv · row 89,315
Source: Development Applications · development-applications.csv · row 22,509
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
412 m away
Proposed 18 storey building containing 234 hotel suites and retail space.
Source: Development Applications · development-applications.csv · row 26,339
View the City's record (opens new tab)Draft Plan of Condominium
481 m away
Draft Plan of Condominium Standard (Technical Stream) for two units
Source: Development Applications · development-applications.csv · row 25,943
View the City's record (opens new tab)Site Plan Control
306 m away
Site Plan Approval for a 15-storey building at 604-610 Bay Street and a 43-storey building at 130 Elizabeth Street. The proposed development integrates the designated heritage Coach Terminal building and includes 2,219 square metres of retail space and 4,717 square metres of institutional space for a Toronto Paramedic Services facility and office uses in the lower levels of the buildings, and 827 purpose-built rental dwelling units, including 210 affordable units, above. This is one of eight sites under the City of Toronto's ModernTO initiative.
Source: Development Applications · development-applications.csv · row 26,602
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
353 m away
Combined Official Plan & Zoning By-law Amendment for a 67-storey mixed use building with 787 square metres of non-residential uses at grade. A total of 774 residential units are proposed.
Source: Development Applications · development-applications.csv · row 24,488
View the City's record (opens new tab)Site Plan Control
353 m away
Site Plan Approval for a 67-storey mixed use building with 787 square metres of non-residential uses at grade. A total of 774 residential units are proposed.
Source: Development Applications · development-applications.csv · row 24,531
View the City's record (opens new tab)Draft Plan of Condominium
432 m away
Standard Draft Plan of Condominium for 17 non-residential units.
Source: Development Applications · development-applications.csv · row 21,297
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
433 m away
Official Plan Amendment application to permit a 64-storey mixed-use building, containing 704 dwelling units, 25,100 square metres of office and 600 square metres of retail gross floor area. A concurrent Zoning Amendment application for the same development has also previously been submitted and is under Appeal.
Source: Development Applications · development-applications.csv · row 21,217
View the City's record (opens new tab)Site Plan Control
450 m away
Ontario Line Osgoode Station
Source: Development Applications · development-applications.csv · row 21,092
View the City's record (opens new tab)Site Plan Control
479 m away
Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use building containing 126 square metres of retail space on the ground floor and 565 residential dwelling units above.
Source: Development Applications · development-applications.csv · row 19,902
View the City's record (opens new tab)Site Plan Control
277 m away
Site plan application for a 41-storey mixed use building, comprising of a 6-storey podium, on top of which is a 35-storey tower. The proposed building will contain retail uses at-grade, along with non-residential use between the 2nd and 20th levels, and residential uses between the 21st to 41st levels. The building will contain a total of 135 new dwelling units. A related ZBA (22 204655 STE 10 OZ) and SPA (22 204654 STE 10 SA) are being circulated concurrently.
Source: Development Applications · development-applications.csv · row 20,659
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
479 m away
Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use building containing 126 square metres of retail space on the ground floor and 565 residential dwelling units above.
Source: Development Applications · development-applications.csv · row 19,846
View the City's record (opens new tab)Site Plan Control
466 m away
Related App 22 202864 STE 11 OZThe proposal is for a Site Plan application to redevelop the subject site by demolishing the existing buildings and constructing a new 30-storey mixed use building. The redevelopment proposed 174 dwelling units resulting in a total of 14,163 sq. m of residential gross floor area (GFA) and 200 sq. m of non-residential GFA which results in a total Floor Space Index (FSI) of 18.12
Source: Development Applications · development-applications.csv · row 23,256
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
466 m away
Zoning By-law Amendment application to permit a 30-storey mixed-use building, containing 216 dwelling units and 320 square metres of non-residential GFA. The site includes a listed property on the Heritage Register which is proposed to be demolished.
Source: Development Applications · development-applications.csv · row 19,749
View the City's record (opens new tab)Site Plan Control
470 m away
Site Plan application to facilitate redevelopment at 200 University Avenue for a 37-storey addition above the existing 16-storey heritage building for an overall height of 53-storeys. The proposal consists of 52,661 square metres of gross floor area and 622 residential units, of which 24 are proposed as affordable rental dweling units. 46 vehicle parking spaces and 363 bicycle parking spaces are proposed.
Source: Development Applications · development-applications.csv · row 20,837
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
464 m away
Official Plan Amendment and Zoning By-Law Amendment applications for a 24 storey tower with a total of 256 residential dwelling units and a total gross floor area of approximately 17,826 square metres, including 17,410 square metres of residential GFA and 416 square metres of at grade retail GFA fronting onto Victoria Street.
Source: Development Applications · development-applications.csv · row 19,593
View the City's record (opens new tab)Site Plan Control
464 m away
Site Plan Approval application for a 24 storey tower with a total of 256 residential dwelling units and a total gross floor area of approximately 17,826 square metres, including 17,410 square metres of residential GFA and 416 square metres of at grade retail GFA fronting onto Victoria Street.
Source: Development Applications · development-applications.csv · row 19,592
View the City's record (opens new tab)Official Plan / Zoning By-law Amendment
433 m away
Zoning By-law Amendment application to permit a 64-storey mixed-use building, containing 704 dwelling units, 25,100 square metres of office and 600 square metres of retail gross floor area.
Source: Development Applications · development-applications.csv · row 20,375
View the City's record (opens new tab)Site Plan Control
433 m away
The redevelopment proposes a 64-storey mixed-use building with a 12-storey office podium and is inclusive of four levels of below-grade parking with a total of 171 parking spaces. The redevelopment proposes 704 dwelling units, resulting in a total residential gross floor area (GFA) of 46,683 sq. m., a total of 24,919 sq. m. of office GFA, and a total of 460 sq. m of retail GFA which results in a total Floor Space Index (FSI) of 21.65, pursuant to GFA calculations under By-law 569-2013.
Source: Development Applications · development-applications.csv · row 20,374
View the City's record (opens new tab)Showing the 20 most recent open applications.
Temporary Structures
Completed Oct 6, 2026
Temporary Structures · Closed
Proposal for Nuit Blanche 2026 (Event) - Project Name: In Water Together (Artist)Qty: 5 - 8.5' x 5.6' x 13' Truss Structures (Christie B-Type)to support modular LED Screen with interactive video artworkPROJECT INSTALLATION SEPT 23, 2026PROJECT OPEN OCT 3, 2026 // PROJECT REMOVAL OCT 4, 2026
Source: Building Permits · cleared-building-permits-since-2017.csv · row 345,731
Building Additions/Alterations
Active
Garage Repair/Reconstruction · Permit Issued · $457K est.
Proposal for waterproofing and concrete repairs to the underground parking garage of an existing office building - CARPARK 36Convenience address is 110 Queen St W
Source: Building Permits · building-permits-active-permits.csv · row 94,294
Temporary Structures
Active
Temporary Structures · Permit Issued
Proposal to erect three (3) temporary tents and a temporary platform for ILG 2026. Install Date September 25, 2026. Tear Down Date October 1, 2026.
Source: Building Permits · building-permits-active-permits.csv · row 72,042
Mechanical(MS)
Completed Sep 18, 2026
Unknown · Closed - Dormant · $10K est.
H.V.A.C. REMOVE OLD CHILLER AND INSTALL NEW CHILLER. EDC
Source: Building Permits · cleared-building-permits-since-2017.csv · row 126,619
Temporary Structures
Active
Certified Tents · Permit Issued
Proposal to install certified tent 14 - 240266 40x20 gable end frame tent. Install Aug 27 - Aug 30.
Source: Building Permits · building-permits-active-permits.csv · row 97,974
Drain and Site Service
Active
Building Permit Related (DR) · Inspection
Drain - Proposed revision includes - light structural repairs, concrete surface repairs, drainage replacement Structural rehab work for the Hagerman east and west stairs at City Hall (Nathan Philips Square)
Source: Building Permits · building-permits-active-permits.csv · row 114,619
Temporary Structures
Active
Temporary Structures · Permit Issued
Proposal for temporary to be decor element during event.Date Erect: July 30, 2026Date Removed: August 4th, 2026
Source: Building Permits · building-permits-active-permits.csv · row 191,677
Building Additions/Alterations
Active
Other(BA) · Under Review
REV: Proposed revision includes - Light structural repairs, concrete surface repairs, drainage replacement Structural rehab work for the Hagerman east and west stairs at City Hall (Nathan Philips Square)
Source: Building Permits · building-permits-active-permits.csv · row 59,429
Temporary Structures
Active
Temporary Structures · Permit Issued
Proposed 2 LED wall structures and upright truss structures.The structures will be built Thursday June 25th and taken down Monday June 29th
Source: Building Permits · building-permits-active-permits.csv · row 62,250
Temporary Structures
Completed Jun 18, 2026
Other Temporary Tents · Closed
Temporary 30'x30' tent re: FIFA Event - Load on May 22, 2026 ; Unload May 27, 2026
Source: Building Permits · cleared-building-permits-since-2017.csv · row 346,449
Temporary Structures
Active
Other(TS) · Permit Issued
Toronto Outdor door Art Fair. The fair will run from July 10th -12th. The site will contain 300 - 10'x10' and 3 frame tents, (30'x30' frame tent / 20' x 20' / 3 - 10'x80')
Source: Building Permits · building-permits-active-permits.csv · row 61,165
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
alter hvac system 20 to 25 inclusive.(east tower - Toronto City Hall)HISTORICAL
Source: Building Permits · cleared-building-permits-since-2017.csv · row 118,558
Mechanical(MS)
Completed Jun 8, 2026
Install/Alter HVAC - only · Closed - Dormant · $80K est.
Install HVAC - ductwork on 6th, 7th, 8th and 9th floors (all west tower) for office purposes. (w24) Cost included in BP00338267.
Source: Building Permits · cleared-building-permits-since-2017.csv · row 88,206
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - Interior alterations to offices on 10th, 12th and 13th floors of West Tower - Interior Alterations
Source: Building Permits · cleared-building-permits-since-2017.csv · row 127,927
Plumbing(PS)
Completed Jun 8, 2026
Building Permit Related(PS) · Closed - Dormant
Plumbing - Interior alterations to the 17th, 18th and 19th floors of an existing office building
Source: Building Permits · cleared-building-permits-since-2017.csv · row 213,778
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - Interior alterations to portions of existing Office areas on 1st and 2nd floors. Note: Applicant claims Guy Zimmerman has approved this scope of work. no documentation provided. Please contact 416 731 3993 Andrey Melnikob from Facilities Planning.
Source: Building Permits · cleared-building-permits-since-2017.csv · row 120,099
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - make interior alterations to washrooms in basement. - Interior Alterations
Source: Building Permits · cleared-building-permits-since-2017.csv · row 120,330
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - East Tower: Interior alterations to portions of 16th, 17th, 18th and 19th floors
Source: Building Permits · cleared-building-permits-since-2017.csv · row 122,205
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - Interior alterations to the 17th, 18th and 19th floors of an existing office building
Source: Building Permits · cleared-building-permits-since-2017.csv · row 120,899
Temporary Structures
Active
Other(TS) · Permit Issued
TOGETHER FEST - Nathan Philips Square - MRG/PSI - June 4th -7th 2026 - Stage Extention/Truss Signage build
Source: Building Permits · building-permits-active-permits.csv · row 79,040
Temporary Structures
Active
Other Temporary Tents · Permit Issued
Proposal to erect a 20'x60' white frame tent. Install date July 3, removal July 7th.
Source: Building Permits · building-permits-active-permits.csv · row 144,768
Rental Renovation Licence
Active
Rental Renovation · Cancelled
Test Test
Source: Building Permits · building-permits-active-permits.csv · row 129,697