Loading your building brief…
Loading your building brief…
Your building brief
Yonge-Bay CorridorNeighbourhoods (158 model)neighbourhoods-4326.geojsonrow 5 · Ward 10 Spadina-Fort YorkCity Wardscity-wards-data-4326.geojsonrow 25
From City of Toronto open data, Toronto Police and CMHC. Pick a tab below; hover a source tag to see the dataset row behind a figure.
Explore the address and its surroundings.
The records' standout deviations for this address, worst first.
Picking what to flag.
Flagging what stands out in the records…
The basics about the building at this address.
100 Queen St W
No RentSafeTO evaluation with this exact address. RentSafeTO only covers apartment buildings with 3+ storeys and 10+ units.
Unverified
Ontario's November 15, 2018 first-occupancy rule matters: new buildings and additions first occupied for residential use after that date can be exempt from the rent-increase guideline. Year built alone cannot establish rent-control status.
First-occupancy evidence is not in the City datasets used here. Confirm the occupancy history with the landlord before relying on rent-increase limits.
Ontario's rent-increase guidance (opens new tab)Address: Address Points (Municipal) · address-points-4326.csv · row 512,236
City evaluation of common areas, exterior and maintenance records.
No RentSafeTO evaluation is on record for this exact address. RentSafeTO only covers apartment buildings with 3+ storeys and 10+ units, and missing data does not establish a building's condition. Evaluated buildings nearby are listed further down.
Based on what the records flag. Take them to the viewing and tick them off as you ask.
Writing your questions…
CMHC's October survey of purpose-built rental apartments, in CAD per month.
Former City of Toronto (Zones 1-4)CMHC Rental Market Surveyrmr-toronto-2025-en.xlsxrow 12
CMHC Rental Market Survey, October 2025
| Unit type | Vacant unitsclosest to a new lease | All unitsincl. long-time tenants |
|---|---|---|
| Bachelor | $1,713 | $1,526 |
| 1 bedroom | $2,092 | $1,914 |
| 2 bedrooms | $2,857 | $2,457 |
| 3+ bedrooms | Not published | $3,195 |
Paste the rental ad on the home page and the asking rent is compared with these figures here.
Survey averages describe purpose-built rental apartments across Former City of Toronto (Zones 1-4), a much bigger area than one block; condos and basement units rent differently. They are not a valuation of this apartment, and included utilities may differ.
Source: CMHC Rental Market Survey · rmr-toronto-2025-en.xlsx · row 12
RentSafeTO apartment buildings within 250 m, nearest first. Useful for comparing options on the same block.
At or above the city median (92)Up to 10 points belowMore than 10 below
| Address | Score | Distance |
|---|---|---|
| 111 Chestnut StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 6,277 | 90 slightly below median | 204 m |
| 570 Bay StApartment Building Evaluations (RentSafeTO)apartment-building-evaluations-2023-current.csvrow 5,562 | 97 at or above median | 223 m |
Scores are each building's latest evaluation. What the score means.
Active building permits within 250 m, and the major projects among them.
477Building Permitsbuilding-permits-active-permits.csv5 rows, e.g. 129,697, 72,042, 79,040, 79,572, 84,935
active permits
New Building or Demolition permits, or estimated construction cost of $1,000,000 or more.
Building permit · Building Additions/Alterations
158 m away
Proposed interior alteration, modifications to architectural, mechanical, electrical, and structural at levels B4, B2, B1, Ground, Levels 2, 4, 5 and 6 at the North Tower. Also includes floors 7 and 8 under Part B of the scope.
Source: Building Permits · building-permits-active-permits.csv · row 62,797
Building permit · Building Additions/Alterations
158 m away
Proposal for interior alterations to office space - level 4,5, 9,10
Source: Building Permits · building-permits-active-permits.csv · row 103,389
Building permit · New Building
180 m away
An issued permit does not establish an active construction schedule. Dates and statuses are shown as the City records them.
Planning applications within 250 m: rezonings, site plans, condominiums and subdivisions. One project often has several applications.
Draft Plan of Subdivision
125 m away
Draft Plan of Subdivision for 4 development Blocks.
Source: Development Applications · development-applications.csv · row 18,524
View the City's record (opens new tab)All active permits; cleared permits only if completed since 2025-01-01.
Temporary Structures
Active
Temporary Structures · Not Started
Temporary installation of a 20 ft x 20 ft, 12 ft high promotional/wellness station for the 2026 TCS Toronto Waterfront Marathon. Install date October 16, 2026. Removal date October 18, 2026.
Source: Building Permits · building-permits-active-permits.csv · row 150,114
Temporary Structures
Active
Temporary Structures · Under Review
Proposal to erect three temporary structures for Toronto Waterfront Marathon.Set up: 16 Oct. 2026; Tear down: 18 Oct. 2026
Source: Building Permits · building-permits-active-permits.csv · row 69,024
Temporary Structures
Active
Certified Tents · Inspection
Proposed installation of temporary tenting for annual event - ONE- 25mx35m - TENT CERT#25 135831-Anchored by concrete weights., SEVEN- 10'x10' - TENT CERT#25 135788 ,ONE - 10'x20 -TENT CERT#25 135788, TWO - 15'x30' tents, Anchored by clips. Install is Oct13th-14th. Event is Oct 15th . Removal is Oct 16th.
Source:
Requests to the City, Jan 1, 2026 – Sep 30, 2026.
These 311 requests are NOT complaints against the selected building. The City records them by postal area, intersection or ward, never by building.
29
Only requests reported at a street intersection have a location; requests reported by postal code are not included here.
19,118
Every request in the ward, any location type.
Resolution information is unavailable: this dataset has no closed dates or resolution-time fields. “Open” means the status was New or In Progress when the City published the file. Nearby and ward totals cover different areas and should not be compared directly.
Incidents per 100,000 people. Bar: Yonge-Bay Corridor; tick: all of Toronto.
More than 10% below the city rateWithin 10%More than 10% above
Above city rate560 incidents · rate down 55.7 from 2024
Below city rate27 incidents · rate down 72.3 from 2024
Above city rate137 incidents · rate down 361.9 from 2024
Above city rate92 incidents · rate down 33.7 from 2024
Above city rate2 incidents · rate up 5.8 from 2024
Above city rate50 incidents · rate down 100.8 from 2024
Above city rate2 incidents · rate up 5.8 from 2024
Above city rate67 incidents · rate down 72.8 from 2024
Above city rate35 incidents · rate down 85.9 from 2024
Rates are incidents per 100,000 people, published by Toronto Police Service per neighbourhood. Neighbourhood rates describe the whole neighbourhood, not a street or building.
2021 Census · population 12,645Neighbourhood Profiles, 2021 Censusnbhd_2021_census_profile_full_158model.xlsxspreadsheet row 4, neighbourhood 170. Bar: Yonge-Bay Corridor; tick: median of Toronto's 158 neighbourhoods.
More than 10% below the medianWithin 10%More than 10% above
Well above the median
Well above the median
Well below the median
2021 Census, City of Toronto Neighbourhood Profiles (158 neighbourhoods). Shares are computed here from the published counts. Only cost, housing burden and repairs are colour-rated; grey bars are shown for context. Shelter cost is rent plus utilities as the census defines it, from 2021; it is not a current asking rent.
Unverified community feedback and resident experiences.
No reviews yet. Tenant reviews will appear here once posting is available.
Reviews are subjective opinions of contributors and do not represent verified City inspections or formal tenancy dispute determinations.
Noise wall required in support of Osgoode Station Construction (Ontario Line South Project)
Source: Building Permits · building-permits-active-permits.csv · row 42,110
Building permit · New Building
0 m away
Replacement of the existing parking slab waterproofing, upgrades to existing infrastructure for site servicing, new security bollards on Osgoode Lane and the repaving of Osgoode Laneway, hard and soft landscaping, new reflecting pond and supporting water circulation equipment, new Teaching Lodge, plinths for the installation of sculpture, polished stainless-steel Metis Voyageur Canoe, various Muntz metal guards, railings, and signage.
Source: Building Permits · building-permits-active-permits.csv · row 108,604
Building permit · Building Additions/Alterations
177 m away
Voluntary installation of sprinkler, fire alarm and geothermal infrastructure to facilitate future upgrades.Commissioning of existing unconnected sprinkler systems on select areas on levels 1 & 3.
Source: Building Permits · building-permits-active-permits.csv · row 136,934
Building permit · Building Additions/Alterations
0 m away
Proposal for complete accessibility upgrades.
Source: Building Permits · building-permits-active-permits.csv · row 164,949
Building permit · Building Additions/Alterations
156 m away
Proposal for interior alterations to the lower level & 2nd floor. ballrooms/meeting rms/ support space
Source: Building Permits · building-permits-active-permits.csv · row 192,631
Building permit · Building Additions/Alterations
156 m away
Make interior alterations to Marriot hotel.
Source: Building Permits · building-permits-active-permits.csv · row 183,729
Building permit · Building Additions/Alterations
177 m away
Interior alterations to build walls in basement level for new electrical room, upgrade electrical distribution system, and 1 roof top generator (with structural ugrades). Existing Courthouse and Office building.
Source: Building Permits · building-permits-active-permits.csv · row 170,875
Building permit · Building Additions/Alterations
180 m away
Make interior alterations to portions of the basment floor to the 6th floor and new roof structure and dormers. Existing & Proposed Use: Courthouse ( Osgoode Hall)
Source: Building Permits · building-permits-active-permits.csv · row 101,701
Temporary Structures
Completed Oct 6, 2026
Temporary Structures · Closed
Proposal for Nuit Blanche 2026 (Event) - Project Name: In Water Together (Artist)Qty: 5 - 8.5' x 5.6' x 13' Truss Structures (Christie B-Type)to support modular LED Screen with interactive video artworkPROJECT INSTALLATION SEPT 23, 2026PROJECT OPEN OCT 3, 2026 // PROJECT REMOVAL OCT 4, 2026
Source: Building Permits · cleared-building-permits-since-2017.csv · row 345,731
Building Additions/Alterations
Active
Garage Repair/Reconstruction · Permit Issued · $457K est.
Proposal for waterproofing and concrete repairs to the underground parking garage of an existing office building - CARPARK 36Convenience address is 110 Queen St W
Source: Building Permits · building-permits-active-permits.csv · row 94,294
Temporary Structures
Active
Temporary Structures · Permit Issued
Proposal to erect three (3) temporary tents and a temporary platform for ILG 2026. Install Date September 25, 2026. Tear Down Date October 1, 2026.
Source: Building Permits · building-permits-active-permits.csv · row 72,042
Mechanical(MS)
Completed Sep 18, 2026
Unknown · Closed - Dormant · $10K est.
H.V.A.C. REMOVE OLD CHILLER AND INSTALL NEW CHILLER. EDC
Source: Building Permits · cleared-building-permits-since-2017.csv · row 126,619
Temporary Structures
Active
Certified Tents · Permit Issued
Proposal to install certified tent 14 - 240266 40x20 gable end frame tent. Install Aug 27 - Aug 30.
Source: Building Permits · building-permits-active-permits.csv · row 97,974
Drain and Site Service
Active
Building Permit Related (DR) · Inspection
Drain - Proposed revision includes - light structural repairs, concrete surface repairs, drainage replacement Structural rehab work for the Hagerman east and west stairs at City Hall (Nathan Philips Square)
Source: Building Permits · building-permits-active-permits.csv · row 114,619
Temporary Structures
Active
Temporary Structures · Permit Issued
Proposal for temporary to be decor element during event.Date Erect: July 30, 2026Date Removed: August 4th, 2026
Source: Building Permits · building-permits-active-permits.csv · row 191,677
Building Additions/Alterations
Active
Other(BA) · Under Review
REV: Proposed revision includes - Light structural repairs, concrete surface repairs, drainage replacement Structural rehab work for the Hagerman east and west stairs at City Hall (Nathan Philips Square)
Source: Building Permits · building-permits-active-permits.csv · row 59,429
Temporary Structures
Active
Temporary Structures · Permit Issued
Proposed 2 LED wall structures and upright truss structures.The structures will be built Thursday June 25th and taken down Monday June 29th
Source: Building Permits · building-permits-active-permits.csv · row 62,250
Temporary Structures
Completed Jun 18, 2026
Other Temporary Tents · Closed
Temporary 30'x30' tent re: FIFA Event - Load on May 22, 2026 ; Unload May 27, 2026
Source: Building Permits · cleared-building-permits-since-2017.csv · row 346,449
Temporary Structures
Active
Other(TS) · Permit Issued
Toronto Outdor door Art Fair. The fair will run from July 10th -12th. The site will contain 300 - 10'x10' and 3 frame tents, (30'x30' frame tent / 20' x 20' / 3 - 10'x80')
Source: Building Permits · building-permits-active-permits.csv · row 61,165
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
alter hvac system 20 to 25 inclusive.(east tower - Toronto City Hall)HISTORICAL
Source: Building Permits · cleared-building-permits-since-2017.csv · row 118,558
Mechanical(MS)
Completed Jun 8, 2026
Install/Alter HVAC - only · Closed - Dormant · $80K est.
Install HVAC - ductwork on 6th, 7th, 8th and 9th floors (all west tower) for office purposes. (w24) Cost included in BP00338267.
Source: Building Permits · cleared-building-permits-since-2017.csv · row 88,206
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - Interior alterations to offices on 10th, 12th and 13th floors of West Tower - Interior Alterations
Source: Building Permits · cleared-building-permits-since-2017.csv · row 127,927
Plumbing(PS)
Completed Jun 8, 2026
Building Permit Related(PS) · Closed - Dormant
Plumbing - Interior alterations to the 17th, 18th and 19th floors of an existing office building
Source: Building Permits · cleared-building-permits-since-2017.csv · row 213,778
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - Interior alterations to portions of existing Office areas on 1st and 2nd floors. Note: Applicant claims Guy Zimmerman has approved this scope of work. no documentation provided. Please contact 416 731 3993 Andrey Melnikob from Facilities Planning.
Source: Building Permits · cleared-building-permits-since-2017.csv · row 120,099
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - make interior alterations to washrooms in basement. - Interior Alterations
Source: Building Permits · cleared-building-permits-since-2017.csv · row 120,330
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - East Tower: Interior alterations to portions of 16th, 17th, 18th and 19th floors
Source: Building Permits · cleared-building-permits-since-2017.csv · row 122,205
Mechanical(MS)
Completed Jun 8, 2026
Building Permit Related(MS) · Closed - Dormant
HVAC - Interior alterations to the 17th, 18th and 19th floors of an existing office building
Source: Building Permits · cleared-building-permits-since-2017.csv · row 120,899
Temporary Structures
Active
Other(TS) · Permit Issued
TOGETHER FEST - Nathan Philips Square - MRG/PSI - June 4th -7th 2026 - Stage Extention/Truss Signage build
Source: Building Permits · building-permits-active-permits.csv · row 79,040
Temporary Structures
Active
Other Temporary Tents · Permit Issued
Proposal to erect a 20'x60' white frame tent. Install date July 3, removal July 7th.
Source: Building Permits · building-permits-active-permits.csv · row 144,768
Rental Renovation Licence
Active
Rental Renovation · Cancelled
Test Test
Source: Building Permits · building-permits-active-permits.csv · row 129,697